- Client: Maruti Suzuki India Limited (MSIL), Rohtak
- Project Scope: 4 x 1500 KVA Euro Diesel DRUPS Systems
Challenges:
- Need for zero-blackout power in a highly sensitive R&D environment.
- Limited space and need for acoustic compliance.
Execution Strategy:
- Deployed advanced DRUPS systems with rotary flywheel energy storage.
- Acoustic enclosures and vibration dampers to maintain lab-grade standards.
- Swift commissioning to match facility expansion timelines.
Unique Highlights:
- Instant switchover in case of power failure – no batteries involved.
- System tested under full load simulation to ensure fail-safe operation.
- Euro Stage compliant system for low emissions and noise.
Client Impact:
- Improved R&D facility uptime and equipment safety.
- Enhanced energy reliability with lower lifecycle cost.
- Strengthened MSIL’s infrastructure for new product development.