- Client: Can Pack India Pvt. Ltd.
- Location: Nuh, Haryana
- Industry: Metal Packaging Manufacturing
- Project Duration: 8 Months
Background
CAN PACK Group, one of the world’s largest metal packaging manufacturers, operates globally with a strong presence in India through Can Pack India Pvt. Ltd. Headquartered in Aurangabad, Maharashtra, the company continues to expand its manufacturing capabilities to meet growing demand. As part of this expansion, Can Pack India set up a new production unit in Nuh, Haryana.
The Challenge
To ensure uninterrupted power for the new facility and maintain operational continuity, Can Pack India required a high-capacity, dependable power backup solution. The objective was to implement a system that could provide instant backup without compromising the plant's operational efficiency.
Our Solution
Green Power International was entrusted with the Supply, Installation, Testing, and Commissioning (SITC) of 2 x 2000 KVA Diesel Rotary UPS (DRUPS) Systems for the Nuh facility. The comprehensive scope of the project included:
- Engineering Design
- Procurement of Equipment
- Installation & Testing
- Final Commissioning
Execution & Timeline
Despite the complexity and scale of the project, Green Power International successfully executed the entire scope within a commendable period of 8 months. The plant was inaugurated in the presence of the Honorable Industrial Minister of Haryana, signifying the importance of the project and its successful implementation.
Outcome
- Seamless backup power with minimal switchover time
- Enhanced operational reliability for the new manufacturing unit
- Strengthened confidence of Can Pack Group in Green Power International’s project capabilities
Other Notable Projects by Green Power International
Green Power International has consistently delivered high-performance power solutions across India and Southeast Asia. Here are a few of our key project highlights:
India-Based Projects
- MSIL R&D Center, Rohtak: 4 x 1500 KVA Euro Diesel DRUPS systems
- OIL Tengaghat, Assam: 3 x 2000 KWe MWM Natural Gas Gensets
- NTPC Talcher: 400 TR Flue Gas Waste Heat Conditioning System
- OIL India Limited, Duliajan: O&M services for 20 MW Gas Turbine Power Plant
Ongoing Service Contracts
- DMH Site: O&M contract for VAM units (3 x 350 TR)
- ONGC, Rajahmundry: PMC for RSE Gas Gensets
International & Specialized Jobs
- Thailand (TUM, PCG, TEG, PPP): Multiple assignments including head assembly, turbocharger installations, and CPU commissioning
- Training Programs: Onsite technical training conducted for Mr. Tom (GPI Thailand) at Lokmangal and DMH, Pune
Conclusion
The successful completion of the Can Pack India project highlights Green Power International’s commitment to excellence, timely execution, and client satisfaction. With a growing list of prestigious clients and repeat business, Green Power continues to lead in delivering reliable and innovative power solutions across the globe.