• Client: Oil and Natural Gas Corporation Ltd. (ONGC), Tripura
  • Project Scope: 6 x 2.1 MWe MWM Gensets

Challenges:

  • Logistical hurdles in transporting equipment to a remote and terrain-heavy site.
  • Limited skilled manpower locally.
  • Need for reliable power in an area with unstable grid connectivity.

Execution Strategy:

  • Modular installation approach to simplify transport and erection.
  • Training programs for local technicians to aid ongoing operations.
  • Use of natural gas available onsite as primary fuel source.

Unique Highlights:

  • Fully integrated control and SCADA system.
  • Compact footprint of gensets for easier deployment.
  • 24x7 remote performance monitoring.

Client Impact:

  • ONGC achieved self-reliant power generation at site.
  • Significantly reduced energy logistics and costs.
  • Ensured operational continuity in exploration activities.

You Might Also Like

In a bid to ensure uninterrupted power performance and operational....

Read More

At their state-of-the-art R&D center, MSIL required an advanced power....

Read More

CAN PACK Group, one of the world’s largest metal packaging....

Read More