- Client: Oil and Natural Gas Corporation Ltd. (ONGC), Tripura
- Project Scope: 6 x 2.1 MWe MWM Gensets
Challenges:
- Logistical hurdles in transporting equipment to a remote and terrain-heavy site.
- Limited skilled manpower locally.
- Need for reliable power in an area with unstable grid connectivity.
Execution Strategy:
- Modular installation approach to simplify transport and erection.
- Training programs for local technicians to aid ongoing operations.
- Use of natural gas available onsite as primary fuel source.
Unique Highlights:
- Fully integrated control and SCADA system.
- Compact footprint of gensets for easier deployment.
- 24x7 remote performance monitoring.
Client Impact:
- ONGC achieved self-reliant power generation at site.
- Significantly reduced energy logistics and costs.
- Ensured operational continuity in exploration activities.