- Client: Oil India Limited
- Location: Tengakhat, Assam
- Solution: 3 x 2000 kWe MWM Natural Gas Gensets
Project Overview:
OIL, a Maharatna PSU, was looking to expand power generation at its Tengakhat facility through cleaner, gas-based solutions. GPI deployed three 2000 kWe MWM natural gas gensets under challenging logistical and environmental conditions.
Challenges:
- Remote site with limited accessibility
- Harsh weather conditions affecting equipment handling
- Synchronisation with existing plant utilities
Execution Strategy:
A phased delivery model was adopted—ensuring that installation, testing, and commissioning progressed with minimal disruption to existing operations. Local manpower was trained for operation and maintenance to ensure smooth post-handover functioning.
Key Outcomes:
- Optimized fuel efficiency using advanced gas engine technology
- Reduced carbon emissions significantly compared to diesel alternatives
- Strengthened GPI’s portfolio in gas-based energy solutions for oil & gas clients