• Client: Multiple SMEs in an Industrial Cluster (Undisclosed)
  • Location: Rajasthan
  • Scope: Supply & Installation of 3 x 500 KVA E2P Gas Gensets

Challenges:

  • Rapid switch from diesel to gas-based gensets due to GRAP regulations
  • Balancing power needs of various SMEs in a shared environment
  • Operational training and change management

Execution Strategy:

  • Installed gensets with smart load-sharing controllers
  • Provided gas supply line routing design with centralized monitoring
  • Delivered training sessions for onsite O&M teams

Unique Highlights:

  • First-of-its-kind decentralized clean power system for a cluster
  • GRAP-compliant low-emission installation
  • High efficiency and lower running costs vs. diesel gensets

Client Impact:

  • Enabled uninterrupted operations amidst regulatory restrictions
  • Lowered energy cost by 25–30%
  • Created replicable model for industrial parks in polluted zones

You Might Also Like

In a bid to ensure uninterrupted power performance and operational....

Read More

At their state-of-the-art R&D center, MSIL required an advanced power....

Read More

CAN PACK Group, one of the world’s largest metal packaging....

Read More