- Client: DLF Limited
- Location: Cyber City, Gurgaon
- Gas Generators Involved: Nos. 3, 4 & 5
- Timeline: January–March 2018
Project Overview:
DLF entrusted GPI with the E-60 maintenance of its gas generator systems at Building No. 5—a premium commercial hub. The scope was comprehensive and technically demanding, involving the complete overhaul of high-capacity gensets.
Challenges:
- Tight working windows to avoid affecting commercial tenants
- Precision engineering needed for components like piston-liner assemblies and bearings
- Requirement to improve component longevity and reduce breakdown frequency
Work Carried Out:
- Dismantling and assembling of cylinder heads
- Mounting of liner-piston assemblies and connecting rods
- Main & big-end bearing inspection and fitting
- Modification of BOP motors: Replaced plastic cooling fans with custom aluminum casing and fan blades to reduce mechanical failures
- Installed lubricating oil heaters inside GT lube oil tank to ensure performance during winter months
Innovative Solutions:
- BOP fan redesign improved equipment uptime
- Reduced cost of ownership through longer-lasting components
- Minimised machine downtime during execution
Client Benefits:
- Enhanced equipment reliability
- Improved efficiency with custom upgrades
- Delivered with zero disruption to commercial operations