• Client: Can Pack India
  • Project Scope: SITC of 2 x 2000 KVA Diesel Rotary UPS Systems

Challenges:

  • Tight project timeline for plant inauguration.
  • Need for highly stable power for high-speed production lines.

Execution Strategy:

  • Fast-tracked engineering, procurement, and commissioning.
  • Detailed load profiling to configure DRUPS settings for can-manufacturing machines.
  • Coordinated installation with site construction team to avoid overlaps.

Unique Highlights:

  • Project completed in 8 months – from concept to commissioning.
  • DRUPS system ensures less than 1 second switchover.
  • Plant inaugurated by the Honorable Industrial Minister of Haryana.

Client Impact:

  • Achieved reliable power with zero production downtime.
  • Boosted confidence for future plant expansions.
  • Enabled smooth launch of production in a new region.

You Might Also Like

In a bid to ensure uninterrupted power performance and operational....

Read More

At their state-of-the-art R&D center, MSIL required an advanced power....

Read More

CAN PACK Group, one of the world’s largest metal packaging....

Read More