- Client: Leading Indian Data Center Operator (Confidential)
- Location: Hyderabad, Telangana
- Scope: Deployment of 2 x 2000 KVA Diesel Rotary UPS Systems (DRUPS)
- Application: Mission-critical backup for high-load data center
Challenges:
- Guaranteeing uninterrupted power in a Tier-IV data center setup
- Managing transient loads during failover
- Compliance with data center acoustic and emissions norms
Execution Strategy:
- Configured DRUPS for fast switchover with grid and generator synchronization
- Engineered vibration isolation pads and sound-proof enclosures
- Integrated with building management system (BMS)
Unique Highlights:
- Supports 24x7 data operations with seamless transfer capabilities
- Reduced overall footprint compared to conventional UPS + DG systems
- Long-duration backup with fuel efficiency
Client Impact:
- Achieved guaranteed uptime with zero blackout risk
- Enhanced reputation with SLAs met consistently
- Scalable infrastructure for future data expansion