- Client: DLF
- Scope: E-60 Maintenance of GG No. 3, 4 & 5
- Duration: Jan 2018 to Mar 2018
Challenges:
- Complex dismantling and reassembly in a commercial setting
- Frequent failures of plastic GG BOP motor fans
Execution Strategy:
- Replaced plastic fan components with custom Aluminum castings
- Fitted Lubrication Oil Heaters in GT Lub Oil Tank to reduce cold start failures
- Carried out complete piston-liner-rod-head reassembly with high precision
Unique Highlights:
- In-house innovation to reduce breakdowns and increase durability
- Improved performance with minimal additional cost
Client Impact:
- Enhanced reliability of standby gensets for commercial property
- Reduced operational downtime and maintenance cost
- Reinforced trust in GPI’s service engineering capabilities