• Client: DLF
  • Scope: E-60 Maintenance of GG No. 3, 4 & 5
  • Duration: Jan 2018 to Mar 2018

Challenges:

  • Complex dismantling and reassembly in a commercial setting
  • Frequent failures of plastic GG BOP motor fans

Execution Strategy:

  • Replaced plastic fan components with custom Aluminum castings
  • Fitted Lubrication Oil Heaters in GT Lub Oil Tank to reduce cold start failures
  • Carried out complete piston-liner-rod-head reassembly with high precision

Unique Highlights:

  • In-house innovation to reduce breakdowns and increase durability
  • Improved performance with minimal additional cost

Client Impact:

  • Enhanced reliability of standby gensets for commercial property
  • Reduced operational downtime and maintenance cost
  • Reinforced trust in GPI’s service engineering capabilities

You Might Also Like

In a bid to ensure uninterrupted power performance and operational....

Read More

At their state-of-the-art R&D center, MSIL required an advanced power....

Read More

CAN PACK Group, one of the world’s largest metal packaging....

Read More