• Client: Indian Oil Corporation Limited (IOCL), Barauni Refinery
  • Project Scope: EPC and Commissioning of 4 x 2.8 MWe MWM TCG 2032 V16 Natural Gas Gensets
  • Completion Year: 2021

Challenges:

  • Integration with refinery operations without disrupting ongoing processes.
  • Adherence to strict emissions compliance standards.
  • Timely delivery amid COVID-related restrictions.

Execution Strategy:

  • Turnkey approach including detailed site analysis, design, supply, installation, and commissioning.
  • Deployed highly efficient MWM gas gensets suitable for continuous industrial operation.
  • Executed phased commissioning to ensure parallel operation with minimal downtime.

Unique Highlights:

  • High-efficiency gensets with low NOx emissions.
  • Seamless integration with refinery’s captive power infrastructure.
  • Robust performance monitoring system.

Client Impact:

  • Enhanced energy reliability for critical refinery operations.
  • Reduced dependency on grid power.
  • Lowered operational emissions, aiding IOCL’s sustainability goals.

You Might Also Like

In a bid to ensure uninterrupted power performance and operational....

Read More

At their state-of-the-art R&D center, MSIL required an advanced power....

Read More

CAN PACK Group, one of the world’s largest metal packaging....

Read More