- Client: Indian Oil Corporation Limited (IOCL), Barauni Refinery
- Project Scope: EPC and Commissioning of 4 x 2.8 MWe MWM TCG 2032 V16 Natural Gas Gensets
- Completion Year: 2021
Challenges:
- Integration with refinery operations without disrupting ongoing processes.
- Adherence to strict emissions compliance standards.
- Timely delivery amid COVID-related restrictions.
Execution Strategy:
- Turnkey approach including detailed site analysis, design, supply, installation, and commissioning.
- Deployed highly efficient MWM gas gensets suitable for continuous industrial operation.
- Executed phased commissioning to ensure parallel operation with minimal downtime.
Unique Highlights:
- High-efficiency gensets with low NOx emissions.
- Seamless integration with refinery’s captive power infrastructure.
- Robust performance monitoring system.
Client Impact:
- Enhanced energy reliability for critical refinery operations.
- Reduced dependency on grid power.
- Lowered operational emissions, aiding IOCL’s sustainability goals.